30 Interior doors have arrived: solid-core for sound insulation and feel, birch veneer.
92image18.jpg
20image19.jpg
39 Baseboard moulding has arrived
95image21.jpg
21 Laundry room doors: these should be dual hinged doors.
21 Door between dressing area and master bath, with glass panel.
39 Master bath shower wall going up
42image25.jpg
37 Shower threshhold; will door frame cover the seam?
89 Public bath tub surround: beachglass and moonstone highlighted by the white grout.
90image28.jpg
19image29.jpg
36 Master bath shower in irridescent glasstile
93 After Verizon screwed us over with the first non-install, they finally came back 20 days later, and hours late; how can this be so hard?
68image32.jpg
56image33.jpg
32image34.jpg
46image35.jpg
25 High efficiency water heater, 50 gallons; lots of machinery on the top.
26image37.jpg
23image38.jpg
26 Slop-sink waiting installation in the basement
22 Door and drawer pulls installed on the cabinets; this is the 8 foot tall corner cabinet.
33 Wall cabinets with pulls in the northwest corner.
33 Wall cabinets above the coffee-bar area, 12 linear feet of 'em.
85 Doors with pulls in the area which will be supporting the breakfast bar countertop.