Show JPGs: House-Arlington-construction/2001-09-09_ac_floors_cat


Click on any directories below to see images there


Click on the "thumbnail" images to see the full-sized image, whose size is shown.

Thumbnail KB Description
37 Air Conditioner air handler installed -- unfortunately before the floors were stained with their corrosive chemicals.
35image02.jpg
39 Top floor with plastic to protect the metal studs from the corrosive chemicals.
48 Top floor roof trusses -- the only wood in the house. Second AC air handler installed in the attic. Unfortunately it and its ducting block any useful access to the attic from below.
19 Small cracks forming in the main floor concrete floors near the opening for the stairs.
52 Main stair steel skeleton.
82 Not at the new house! Egbert sitting in the just-watered plant pot at the old house.

Chris Shenton