92 Foundation footers poured, looking West. Bump-out on left is for front-door.
91 Looking West Southwest. The extra bumpouts are for window-wells; each has a hole in it where gravel will live for drainage.
78 Hopefully this tree will live; it's the only one on the lot.
93 Basement is about 6 feet underground.
88 Foundation footings for basement door stairwell. Window well footings are on the left, with form hole for gravel.
72 Irene with basement outside stairwell footings. Pile of covered dirt above is for backfilling the hole once the basement block walls go up.